Project Budget

$2M

Construction Period

August 2009 – December 2009

Address

Berrimah Rd, Berrimah NT 0828, Australia

Project Description

Working closely with Mobile Electrics, which was responsible for its own electrical, mechanical and joinery contracts, Sunbuild completed this cost-efficient construction in 2009. Not only did the project include the design and construction of industrial warehouses; it also involved demolition of the existing workshop and the upgrade of an existing service road.

Featuring a new office space, showroom, sales, service facility and warehouse, the complex was designed to allow maximum airflow, incorporating high-level louvers and ridge vents, enabling a cost efficient structural design.

 