Project Profile

Dawson Street – East Arm

Project Budget

$16.6M

Construction Period

January 2023 to August 2023

Address

11-13 Dawson St, East Arm NT 0822

Project Description

The Cold Storage Transport and Storage Facility was tailored to meet the specific needs of temperature-controlled logistics. Featuring two freezers and one cool room, alongside additional amenities including dry storage, workshop and wash bays. The facility provides a complete solution for storage, maintenance and transportation of goods. This project involved installing 2.1-meter-high precast dado walls to enhance the durability and security of the dry store areas. The precast works were undertaken in-house by Sunbuild.

Key Features:

  • Constructed from a large steel portal frame shed offering durability and flexibility for future expansions or modifications.
  • Designed with provisions for future solar.
  • Comprehensive amenities including office areas and facilities.
  • On-site re-fuelling facility for maintenance of transport vehicles
  • The site spans an expansive 40,000m2, with a building footprint of 6,000m2.
  • Additional features include a dry storage area, workshops for vehicle maintenance and repairs, and wash bays for cleaning and sanitising transport vehicles.

The completion of the Cold Storage Transport and Storage Facility was a significant milestone in meeting growing demand for efficient and reliable cold chain logistics solutions in Darwin.

Ready to discuss your next project?

Get in touch